K-12 Schools

Seaside High School

Project Location: Seaside OR
Project Description: Heinz Mechanical Industries was responsible for all the plumbing work and mechanical work at the new high school in Seaside, Oregon

Sherwood High School

Project Location: Sherwood OR
Project Description: Heinz Mechanical Industries was responsible for all the plumbing work and mechanical work at the high school in Sherwood, Oregon

Powellhurst Elementary

Project Location: Portland OR
Project Description: Heinz was the general contractor at N. Powellhurst Elementary School responsible for replacing one cast iron boiler and adding two new Smith cast iron sectional boilers, including new pumps, equipment skid, new boiler venting, and hydronic piping. We also added hydronic piping in the tunnels for new heating coils and equipment. We also demoed the old chimney and replaced with the new vent stack.

Vernonia K-12

Higher Ed

CCC Student Services Center

Project Description: Heinz Mechanical took on both plumbing and mechanical scope for the new CCC Welcome Center. This building will be the new face of the college, offering a new experience for both new and current students. The plumbing consisted of DWV, domestic water, gas piping, and numerous plumbing fixtures. For the mechanical side we installed radiant heat, chilled water, heating water, and refrigerant piping. Heinz Mechanical was also responsible for the duct work and mechanical equipment which included boilers, fan coils, a split system, chiller, and a DOAS/RTU.

Portland State University

Project Location: Portland OR
Project Description: New evapco 1900 ton Cooling tower installed at Portland State University in 2012. Heinz was the general contractor on this project and responsible for structural and architectural steel, structural upgrades, and mechanical piping.

Linfield University

Project Location: McMinnvile OR
Project Description: Heinz Mechanical Industries upgraded the hydronic system that supplied six of the dorms at Linfield College in McMinnvile. We also installed circuit setters to help regulate the flow of the heating system.

PNCA Rooftop Heat Pumps

Project Location: Portland OR
Project Description: Heinz Mechanical Industries installed the heat pumps as part of the multi city HVAC System. This is the PNCA Building located in Portland, Oregon. We were also responsible for re-plumbing the entire building. We were involved with a composite crew to install the two huge HVAC air handling units.

Gordon Faber Rec Complex

Hospitals

Rainier Springs Hospital

Project Location: Salmon Creek WA
Project Description:Heinz Mechanical Industries was responsible for the plumbing and HVAC systems of Rainier Springs Hospital, a new hospital built in Salmon Creek WA.

Milwaukie Providence MRI

Project Location: Milwaukie OR

SW WA Medical Center

Project Location: Vancouver WA

Providence Seaside Hospital

Medical / TI

St. Helens Mechanical Room

Project Location: St. Helens Oregon
Project Description: Plumbing system installation for new medical facility

Data Centers

Industrial

BPA Ross

Project Location: Vancouver WA
Project Description: Heinz Mechanical Industries was responsible for all the plumbing work and mechanical work at BPA Ross.

BPA 2019

Project Description: Heinz Mechanical took on the plumbing and mechanical scope for this project which included work in 4 separate buildings. The mechanical portion included piping, duct work and building automation system. It also required an extensive radiant floor heating system, 3 heat pump chillers, air handling units, a condensing boiler, and a VRF system. The plumbing scope included water, DWV, compressed air, and gas pipe. Some of the equipment provided were new plumbing fixtures, both gas and electric water heaters, large air compressor system, as well as a complete lubrication system.

Commercial

Oregon Zoo Boiler Room

Project Location: Portland OR
Project Description: Heinz Mechanical Industries was responsible for all the plumbing and mechanical systems for the new Elephant Lands at the Oregon Zoo. This included the elephant heaters in the shade structures, boilers, plumbing for the new pools and water cannons, air handling units.

Ron Tonkin Field

Project Location: Hillsboro OR
Project Description: Heinz Mechanical Industries was responsible for all the plumbing and mechanical at the Hillsboro Hops Stadium in Hillsboro. This is an example of a shower room rough-in. We also completed the team rooms, concession stands, heating and cooling splits, new water heaters, and drainage systems.

PCC Rock Creek Weld Shop

Project Description: Heinz Mechanical had the plumbing and mechanical scope at the PCC Rock Creek Weld Shop. The plumbing scope included replacing domestic water, waste, vent, compressed air piping and installing piping to new weld booths for 6 different gases. For our mechanical scope, we replaced 2 make-up air units and all ductwork serving the weld shop.

Oregon Zoo Elephant Lands

Project Location: Portland OR
Project Description: The shade structure has infrared natural gas heaters to keep the elephants warm in the winter. There are also mister systems that were installed to keep them cool in the summer. Solar panels were installed on the roof to supply pre-heated water to the hot water heater. Heinz Mechanical Industries set three Air Handler Units ranging from 8,000 TO 35,000 CFM.

Portland City Hall

Project Location: Portland OR

Oregon Convention Center

Project Location: Portland OR

Hospitality

Holladay Park Plaza

Project Location: Portland OR
Project Description: Installation of a gas earthquake valve at Holladay Park Plaza

Discuss Your Project With Our Expert Mechanical Contractors!

Call us today (503) 220-0855 to discuss your project with Heinz Mechanical Industries, your local experts in Plumbing, HVAC and Mechanical Systems! Or, leave your information below and we’ll get back to you as soon as possible. We look forward to working with you!

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Start typing and press Enter to search